Since my departure in March this year, the new hexagonal deck on the left has been completed. A roof will eventually be constructed over it too. Underneath the central dome roof are the kitchen and large living area. The extension to the right houses the master bedroom with ensuite plus an office. The extension on the left contains two guest rooms plus an extra bathroom with toilet. A three meter deep covered veranda runs along the entire length of the building at the back.
|